Turnkey is the Lokmatri model at full expression: one contract, one team, one accountable timeline. We carry the project from concept and design through fabrication, construction and commissioning.
Design, civil, steel and MEP scopes stay under one roof — removing interface risk, compressing schedule and giving clients a single point of responsibility.
At a glance
Model
EPC / Turnkey
Scope
Concept → Commission
Interface
Single responsibility
Focus
Schedule certainty
// Capabilities
What we deliver
Eight integrated disciplines — engineered together, delivered as one.
C01
Single-Point Delivery
One contract across design and build.
C02
Integrated Scopes
Civil, steel and MEP coordinated as one.
C03
Programme Control
Master schedule, procurement and logistics.
C04
Commissioning & Handover
Tested, documented, ready to operate.
// Process
Concept to handover
Every engagement runs the same disciplined sequence — adapted to the scope of Civil Construction.
01
Discover
Site study, brief capture, constraints and load cases established.
02
Design
Architectural intent translated into a buildable structural concept.
03
Structural Analysis
FE modelling and code checks across every load combination.
04
Planning
Sequencing, logistics, procurement and programme locked.
05
Fabrication
Jig-controlled fabrication with full QA traceability.
06
Execution
Disciplined site control, erection and integration.
07
Quality Control
Inspection, NDT and dimensional verification at each stage.
08
Handover
Commissioning, documentation and as-built handover.
// Visuals
Selected references
Eight integrated disciplines — engineered together, delivered as one.
// Related
Adjacent capabilities
Eight integrated disciplines — engineered together, delivered as one.